ALBANESE D&S, INC.

ALBANESE D&S, INC.ALBANESE D&S, INC.ALBANESE D&S, INC.
  • Home
  • Services
  • Current Projects
  • Project Highlights
    • Amesbury, MA
    • BWSC
    • MWRA
    • Plymouth, MA
    • Reading, MA
    • Tewksbury, MA
    • Tyngsborough, MA
  • Careers
  • Contact
  • More
    • Home
    • Services
    • Current Projects
    • Project Highlights
      • Amesbury, MA
      • BWSC
      • MWRA
      • Plymouth, MA
      • Reading, MA
      • Tewksbury, MA
      • Tyngsborough, MA
    • Careers
    • Contact

ALBANESE D&S, INC.

ALBANESE D&S, INC.ALBANESE D&S, INC.ALBANESE D&S, INC.
  • Home
  • Services
  • Current Projects
  • Project Highlights
    • Amesbury, MA
    • BWSC
    • MWRA
    • Plymouth, MA
    • Reading, MA
    • Tewksbury, MA
    • Tyngsborough, MA
  • Careers
  • Contact

Current Projects

MWRA Contract 6956 - Watertown & Newton, MA

  • Cleaning and Cement Mortar Lining 
    • 3,200 LF of 20-inch cast iron watermain 
  • Installing 10,600 LF of 20-inch DI watermain
  • Replacement watermain and gate valves for the City of Watertown
  • Replacement of drain lines, drain manhole and catch basin structures 
  • Replacement of sanitary sewer lines and manhole structures 
  • Installing valves, precast valve vaults, air valves, blow- off assemblies, manholes
  • Demolishing and relocating existing Meter 2 from Common/Belmont intersection to Bellevue/Common intersection
  • Replacement of existing Meter 40 on Mount Auburn Street
  • Installation of new pressure reducing valve on Irving Street
  • Removal, handling, transportation and disposal of rock, contaminated soil, and groundwater
  • Installation of temporary stone dust multiuse access paths within DCR area within the Charles River Reservation
  • Installing temporary water bypass for Russell Ave and Bellevue Road for installation of new service connections

MWRA Contract 6956 Photo Gallery

    Mass DOT - Contract 114626 - Everett, MA

    • Full depth pavement reconstruction and pavement milling/overlay
      • 24,000 tons of asphalt
    • ADA-compliant sidewalks and granite curb
      • 30,000 square yards of concrete walks
      • 16,000 linear feet of new granite curbing
      • 15,000 linear feet of removed and reset granite curbing
    • Drainage system
      • 15,000 linear feet of 4" to 24" drain pipe
      • 185 catch basins, 125 drain manholes, and 60 gutter inlets
    • Water system
      • 6,200 linear feet of 4" to 16" water pipe
      • 4,500 linear feet of 10" and 12" water main lining and rehab
      • 135 gate valves 4" to 16"
      • 5,250 linear feet of copper water services
      • 30 hydrants 
    • Installation of a new roundabout 
    • Four existing intersections reconstructed with modern traffic signal equipment
    • New signage and pavement markings
      • 60,000 linear feet of pavement markings
    • Landscaping
      • 6,500 plantings
    • Lighting
      • 22,500 linear feet of conduit
      • 250 electric handholes
      • 145 light pole bases and light poles

    Mass DOT Contract 114626 Photo Gallery

      BWSC - Contract 19-308-004 - Boston, MA

      • Located in Back Bay, Beacon Hill and City Proper
      • Close coordination to maintain operations at:
        • Massachusetts General Hospital
        • Massachusetts Eye and Ear
        • Liberty Hotel
        • Boston Commons
      • Sewer/Drain system
        • 2,500 linear feet of 12" to 24" pipe
        • 4,500 linear feet of 10" to 66" rehabilitation
        • 10 each new manholes/catch basins
      • Water system
        • Temporary water main bypass
        • 10,000 linear feet of 4" to 16" water pipe
        • 1,200 linear feet of 48" water main rehabilitation utilizing HDPE liner
        • 2,000 linear feet of water services
        • 130 each new gate valves
        • 30 each new/reset hydrants
      • Hot mix asphalt paving
        • 10,000 square yards of temporary pavement patching
        • 1,000 square yards of permanent pavement patching
      • 1,000 square yards of cement concrete sidewalk replacement

      BWSC Contract 19-308-004 Photo Gallery

        Middlesex Turnpike Pump Station Rehab - Bedford, MA

        • Middlesex Turnpike Pump Station upgrade
          • Wet well and valve pit
          • Pumps, valves, and piping
          • Control cabinet
          • Natural gas emergency generator
          • Instrumentation control
        • Selective demolition of existing building
        • Concrete repair
        • Painting and epoxy liner
        • 6-inch force main
        • 15-inch PVC gravity sewer main
        • Sewer manholes
        • Temporary bypass
        • Maintain existing works
        • Retaining wall

        Middlesex Turnpike Pump Station Photo Gallery COMING SOON

        Marjorie Street Pump Station - Portsmouth, NH

        • Majorie Street Pump Station upgrade
          • Wet well and valve pit
          • Pumps, valves, and piping
          • Control cabinet
          • Natural gas emergency generator
        • Instrumentation control and SCADA system
        • 4-inch HDPE force main
        • 8-inch PVC gravity sewer main
        • Sewer manholes
        • Ledge excavation and disposal
        • Temporary bypass
        • Maintain existing works

        Marjorie Street Pump Station Photo Gallery COMING SOON

        CHE-004 Phase 1 - Chelsea, MA

        • Located in downtown Broadway
        • Sewer/Drain system
          • 7,300 linear feet of 8" to 24" pipe
        • Water system
          • Temporary water main bypass
          • 2,000 linear feet of 4" to 16" water main
          • 1,000 linear feet of water services with removal of lead
          • 13 each new gate valves
          • 4 each new hydrants
        • Hot mix asphalt paving
          • 1,100 tons of temporary pavement patching
          • 100 tons of permanent pavement patching
        • Fiber optic duct bank
          • 3,000 linear feet of concrete encased duct bank
          • 10 each hand holes

        CHE-004 Phase 1 Photo Gallery COMING SOON

        CMOM Contract 5 - Manchester, NH

        • Sewer/Drain system
          • 1,200 linear feet of 8" to 36" pipe
          • 28 point repairs
          • 13,000 linear feet of 8" to 24" rehabilitation
          • 15 each new catch basins and manholes
        • Cohas Brooke Siphon Replacement
          • 400 linear feet of directional drilling under Cohas Brook
          • 2 each new precast siphon structures
          • 2 each new manholes
          • Sewer bypass
          • Connections to existing
        • Marjam Culvert Rehabilitation
          • Selective demolition of top of existing culvert
          • 300 linear feet of twin 42-inch HDPE drains
          • 4 each new catch basins
          • 700 square feet of metal grating
          • Permanent paving patch
        • Mammoth Road Culvert Cleaning
        • Massabesic Street Culvert Rehabilitation
          • 50 linear feet of twin 42-inch HDPE drains
          • Bar rack
        • Spruce Street Culvert Rehabilitation
          • Replacing 5.5' x 9' box culvert
        • Namaske Lake Boat Ramp Improvements
          • Bioretention basin
          • Drainage
          • Permanent paving boat ramp
          • Stone path
          • Plantings

        CMOM Contract 5 Photo Gallery COMING SOON

        Barlett Street Reconstruction - Portsmouth, NH

        • Water system
          • 2,400 linear feet of 8" to 12" water main
          • 1,000 linear feet of water services
          • 15 each new gate valves
          • 5 each new hydrants
        • Drain system
          • 2,000 linear feet of 12" to 15" pipe
          • 20 each new catch basins/manholes
        • Sewer system
          • 3,000 linear feet of 6" to 8" pipe
          • 15 each new manholes
        • Road reconstruction
          • 10,000 square yards reclaim
          • 3,000 tons of permanent paving
          • 4,000 square yards of concrete walks and pads



        Barlett Street Reconstruction Photo Gallery COMING SOON



        • Home
        • Services
        • Current Projects
        • Project Highlights
        • Careers
        • Contact

        Powered by

        This website uses cookies.

        We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

        Accept